| 1 |
Alsalam Royal palace |
Execution of civil works, electrical installations, and final finishing activities on site, including structural works, infrastructure and electrical systems installation, testing and commissioning, as well as all architectural finishing works, carried out in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
MACC |
| 2 |
Alsafa Royal palace |
Execution of all electrical, mechanical, and finishing works on site, including the supply, installation, testing, adjustment, and commissioning of all electrical and mechanical systems (such as power, lighting, HVAC, plumbing, and fire protection), full coordination among all trades, and completion of all architectural and finishing works, in strict compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 3 |
Red Sea Air port |
Execution of all low current systems works on site, including BMS, covering the supply, installation, integration, testing, configuration, and commissioning of systems such as BMS, CCTV, access control, fire alarm, data and voice networks, PA/BGM, and other ELV systems, in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Honeywell |
| 4 |
Rose Mawaddah Hotel |
Execution of all civil works for Rose Mawaddah Hotel – Makkah, including site preparation, excavation, backfilling, foundations, reinforced concrete structures, masonry walls, plastering, flooring, wall and ceiling finishes, waterproofing, façade works, staircases, partitions, and all associated architectural and structural elements, carried out in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Zamzam Association |
| 5 |
26-Floor Hotel Development – Al Maha Real Estate |
establishment of a hotel comprising 26 identical guest floors and 5 service floors, including site preparation, excavation, foundations, reinforced concrete structures, masonry, plastering, flooring, wall and ceiling finishes, waterproofing, façade works, staircases, partitions, and all associated architectural, structural, and service elements, carried out in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Establishment of a hotel consisting of 26 identical floors and 5 service floors |
| 6 |
Northern border infrastructure |
Implementation of the fiber optic extension for the Tabarjal–Qurayyat line, covering the supply, laying, termination, splicing, testing, and commissioning of fiber cables, along with the development and integration of all associated service areas and infrastructure in Tabarjal, executed in full accordance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Northern Borders Region Infrastructure Development Department |
| 7 |
Al Muhaileb factory |
Construction and commissioning of a factory along with its service building encompassing site preparation, excavation, foundation works, structural and masonry construction, plastering, flooring, wall and ceiling finishes, roofing, installation of utilities, and all associated architectural, structural, and support facilities, executed in strict compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Al Muhaileb Holding Group |
| 8 |
KAP |
Completion of foundations, finishing, and air conditioning works including the finalization of all structural foundations, reinforced concrete and masonry works, comprehensive architectural finishes such as flooring, wall and ceiling treatments, painting, partitions, doors, and windows, along with the supply, installation, testing, balancing, and commissioning of all air conditioning systems (including ducting, units, controls, and accessories), executed in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ministry of Interior |
| 9 |
Alberlanty hospital |
Execution of finishing works and external facades, including all interior finishes such as flooring, wall and ceiling treatments, painting, partitions, doors, and windows, as well as the design, preparation, and installation of external façade elements, cladding, glazing, and decorative features, carried out in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Abdullah Jarallah and Sons |
| 10 |
Iron Pipeline Extension Project |
Implementation of the extension of iron pipelines with diameters of 1600 mm, 1400 mm, and 1200 mm, totaling 60,000 linear meters, including excavation, trench preparation, pipe installation, jointing and welding, protective coating, bedding, backfilling, pressure testing, and commissioning, executed in strict accordance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Al Rashid Trading & Contracting Company |
| 11 |
External Pipeline Protection Works – SWCC |
Supply and installation of external protective materials for pipelines of various diameters, including asphalt coating, mesh reinforcement, and all related civil works such as trench preparation, bedding, backfilling, and surface restoration, executed in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Saline Water Conversion Corporation |
| 12 |
Quba Entertainment |
Construction of the Quba Entertainment Area, including site preparation, earthworks, foundations, structural works, hard and soft landscaping, pathways, recreational facilities, seating areas, lighting, water features, playgrounds, and all associated architectural, civil, and service elements, executed in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Saline Water Conversion Corporation |
| 13 |
Development of drainage in Jeddah city |
Implementation of home sewage connections in Al-Marwa District, Jeddah, including site survey and preparation, excavation, laying of sewer pipes, connection to individual homes, jointing and testing, backfilling, reinstatement of roads and pavements, and commissioning of the complete sewage network, executed in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Al-Muhaidib Contracting Company |
| 14 |
Wadi Al Aqeeq 800 mm Pipeline Replacement |
Execution of the replacement of the 800 mm pipeline at Wadi Al Aqeeq, including detailed site preparation, careful excavation, removal and disposal of the existing pipeline, supply and precise installation of the new pipeline, welding and jointing, application of protective coatings, proper bedding and backfilling, reinstatement of the surrounding area, and full testing and commissioning, carried out in strict compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Saline Water Conversion Corporation |
| 15 |
Riyadh Dammam Road Pipe Repair |
Carrying out pipeline repair works along Riyadh–Dammam Road, including inspection and assessment of existing pipelines, excavation and removal of damaged sections, supply and precise installation of replacement pipes, welding and jointing, protective coating application, bedding and backfilling, reinstatement of the road and surrounding areas, and complete testing and commissioning, all executed in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Saline Water Conversion Corporation |
| 16 |
Al-Jouf Airport |
Implementation of civil and electrical works at Al-Jouf Airport, encompassing comprehensive site preparation, grading, excavation, and construction of foundations, reinforced concrete and masonry structures, flooring, wall and ceiling finishes, partitions, doors and windows, roadways, pavements, drainage systems, and all related civil infrastructure. In parallel, execution of all electrical works, including supply, installation, integration, testing, and commissioning of power distribution networks, lighting systems, emergency and backup systems, and all airport-specific electrical installations, carried out in strict compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
BKS - GACA |
| 17 |
Alsalam Royal palace |
Execution of civil and finishing works, including complete site preparation, construction of foundations and structural elements, masonry, flooring, wall and ceiling finishes, installation of partitions, doors, and windows, plastering, painting, and all related architectural and structural finishing tasks, performed in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
MACC |
| 18 |
Neuom Royal palace |
Comprehensive execution of electrical and mechanical works, including detailed design review, supply, installation, testing, and commissioning of all electrical systems such as power distribution networks, lighting systems, emergency and backup systems, structured cabling, and building automation interfaces, alongside all mechanical systems including HVAC (heating, ventilation, and air conditioning), plumbing, drainage, firefighting systems, gas networks, and other building services. The works also cover full coordination and integration between all trades, routing and installation of ducting, piping, conduits, equipment, controls, and accessories, performance testing, balancing, calibration, and final commissioning, carried out in strict compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 19 |
Mena Royal palace |
Execution of civil and electrical works, including full site preparation, excavation, foundations, structural and masonry construction, flooring, wall and ceiling finishes, partitions, doors and windows, plastering, painting, and all associated architectural and structural elements, alongside the supply, installation, testing, and commissioning of electrical systems such as power distribution, lighting, emergency systems, and other related electrical infrastructure, carried out in full compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 20 |
Developing the infrastructure of Riyadh schools |
Implementation of vinyl flooring works for 25 schools for Tatwer, including thorough surface preparation, leveling and smoothing, precise installation of vinyl sheets or tiles, finishing of edges and joints, sealing, and final quality inspection to ensure durability, proper alignment, and adherence to standards, executed in full compliance with the approved drawings, technical specifications, project requirements, and safety regulations. |
TBC |
| 21 |
King Khalid International Airport Central Warehouse |
Implementation of low current (ELV) systems, encompassing the supply, installation, testing, programming, and commissioning of systems such as CCTV, access control, fire alarm, public address (PA/BGM), data and voice networks, and other low-voltage building systems, with full integration and coordination with all trades, executed in strict accordance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Crete International Company |
| 22 |
KAFD |
Comprehensive execution of civil and electromechanical works, including full site preparation, grading, excavation, foundation construction, reinforced concrete and masonry structures, flooring, wall and ceiling finishes, partitions, doors and windows, plastering, painting, and all associated architectural and structural elements. In parallel, execution of all electromechanical systems, including supply, installation, testing, and commissioning of HVAC systems (heating, ventilation, and air conditioning), plumbing and drainage networks, firefighting systems, power distribution and lighting systems, backup and emergency power, low current (ELV) systems, and other building services. The works also cover coordination and integration between all trades, installation of ducting, piping, conduits, equipment, controls, and accessories, performance testing, balancing, calibration, and final commissioning, executed in strict compliance with the approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Al Bawani Company |
| 23 |
Alsafa Royal palace |
Execution of HVAC electrical panel replacement, including the removal of existing panels, supply and installation of new electrical panels, connection to HVAC systems, wiring, testing, commissioning, and verification of proper operation, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 24 |
Alsalam Royal palace |
Integration of the air conditioning system with the control room, including routing and installation of control and communication cables, linking HVAC equipment to the building management system (BMS), configuration and programming of controllers, performing functional testing and calibration, and final commissioning to ensure efficient operation and accurate monitoring, executed in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 25 |
Mena Royal palace |
Supply, installation, testing, and commissioning of the water cooling system, including MCC panels and all other specified electrical materials, covering full delivery, installation, wiring, interconnection, functional testing, and final commissioning to ensure complete operational performance, executed in strict compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 26 |
Alsalam Royal palace |
Full renovation of the air conditioning and ventilation system, including dismantling and removal of existing equipment, supply and installation of new HVAC units, ductwork, diffusers, vents, controls, and accessories, integration with the building management system (BMS), thorough testing, balancing, and final commissioning to ensure optimal performance, energy efficiency, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 27 |
Alsalam Royal palace |
Provision and installation of air handling units (AHUs), including transportation to site, proper placement and mounting, connection to ducting, electrical, and control systems, integration with the building management system (BMS), complete testing, airflow adjustment, and final commissioning to ensure efficient operation and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 28 |
Chalih Royal palace |
Renovation and upgrade of multiple port cabinets, including disassembly of existing equipment, inspection and refurbishment of cabinet structures, replacement or enhancement of electrical and network components, rewiring, functional testing, and final commissioning to ensure reliable operation and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 29 |
Neuom Royal palace |
Execution of reprogramming of the fire alarm system linked to the air conditioning units at Neom, including assessment of the existing system, modification and updating of control logic, integration with HVAC equipment, configuration of controllers, functional testing, verification, and commissioning to ensure full operational performance, safety compliance, and alignment with approved drawings, technical specifications, project standards, and quality requirements. |
Private Affairs |
| 30 |
KAFD Science Museum |
Supply, installation, and commissioning of the fire fighting system for the Science Museum, including delivery of all required equipment and materials, installation of pipelines, pumps, valves, detectors, sprinklers, and associated accessories, integration with control panels and building management systems, comprehensive testing, functional verification, and operational handover, executed in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
KAFD |
| 31 |
KAFD 4.03 |
Supply, installation, and commissioning of the intercom system, including provision of all required equipment and materials, installation of cabling and devices, system configuration and programming, functional testing, operational verification, and final handover, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
KAFD |
| 32 |
King Khalid International Airport Main Warehouse |
Supply, installation, and commissioning of the CCTV and server systems, including provision of all required equipment and materials, installation of cameras, servers, racks, cabling, and accessories, system configuration and programming, integration with related systems, functional testing, operational verification, and final handover, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
SATS airfreight terminal KKIA CREET |
| 33 |
King Khalid International Airport Main Warehouse |
Provision, installation, and commissioning of passive and fiber optic systems, including structured cabling and fiber networks, with complete integration of low current (LC) systems with the RAC, and full interfacing with the fire alarm and security systems. The scope includes system setup, coordination, testing, validation, and final handover to ensure seamless operation and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
SATS airfreight terminal KKIA CREET |
| 34 |
King Khalid University Hospital |
Supply, installation, and operation of passive and active systems, including Fire Alarm System, Access Control System (ACS), IPTV, CCTV, Network Communication System (NCS), MATV, TPT, Public Address System (PAS), and all associated security systems. The scope includes complete system integration, configuration, testing, verification, and commissioning, ensuring full functionality, reliable performance, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
King Khalid University |
| 35 |
Upgrading the CCTV system for the Ministry of Education building |
Supply, installation, and commissioning of passive and active systems, including CCTV, network infrastructure, and security systems. The scope covers delivery of all equipment, installation, integration, configuration, testing, verification, and final handover to ensure full functionality, reliability, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ministry of Education, Department of Education, Riyadh |
| 36 |
Alberlanty hospital |
Execution of supply, installation, testing, and commissioning of passive and active systems, including CCTV, Public Address System (PAS), and Fire Alarm System (FAS), encompassing delivery of all equipment, proper installation, system integration, configuration, functional testing, verification, and final handover, ensuring reliable performance and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Alberlanty hospital |
| 37 |
KAP |
Supply, installation, and commissioning of passive and active systems for KAP 01 , including Fire Alarm System (FAS), Access Control System (ACS), IPTV, CCTV, Network Communication System (NCS), MATV, TPT, Public Address System (PAS), and all associated security systems. The scope comprises full delivery of equipment and materials, installation, integration, programming, testing, functional verification, and final handover, ensuring seamless operation, reliability, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ministry of Interior |
| 38 |
Dr. Muhammad Al-Faqih Hospitals |
Comprehensive supply, installation, integration, testing, and commissioning of passive and active systems, including CCTV and Access Control System (ACS), covering delivery, site preparation, installation of all hardware and cabling, configuration and programming of devices, system integration and coordination with other trades, performance testing, functional verification, and final commissioning, executed in strict compliance with approved drawings, technical specifications, project standards, quality assurance requirements, and all applicable safety regulations. |
Dr. Muhammad Al-Faqih |
| 39 |
Madinah General Hospital |
Supply, installation, and commissioning of Fire Alarm System (FAS) and Uninterruptible Power Supply (UPS), including delivery of all equipment and materials, proper installation, system integration, configuration, testing, verification, and final handover, ensuring reliable operation, safety, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Hospitals of the Ministry of Health, Medina |
| 40 |
Al-Reef Residential Project – Diplomatic Quarter |
Execution of painting works for the rural residential project, including thorough surface preparation, repair of defects, priming, application of paints or coatings, and finishing to achieve uniform coverage and quality, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Tameer |
| 41 |
Al-Reef Residential Project – Diplomatic Quarter |
Execution of plastering works for the rural residential project, including surface preparation, application of base and finishing coats, smoothing, and defect correction to achieve uniform and high-quality finishes, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Tameer |
| 42 |
Al-Reef Residential Project – Diplomatic Quarter |
Execution of blockwork for the rural residential project, including site preparation, layout marking, laying of concrete or masonry blocks, alignment and leveling, jointing and pointing, and curing, ensuring structural integrity and quality, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Tameer |
| 43 |
Al-Reef Residential Project – Diplomatic Quarter |
Execution of tile works for the rural residential project, including surface preparation, layout and alignment, cutting, fixing of floor and wall tiles, grouting, cleaning, and finishing to achieve uniform and high-quality surfaces, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Tameer |
| 44 |
Al-Reef Residential Project – Diplomatic Quarter |
Execution of stone works for the rural residential project, including surface preparation, selection and cutting of stones, installation, jointing, finishing, and cleaning to achieve uniform, durable, and high-quality surfaces, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Tameer |
| 45 |
Al-Reef Residential Project – Diplomatic Quarter |
Execution of gypsum works and suspended ceilings for the Al-Reef residential project, including surface preparation, installation of gypsum boards, framing, joints finishing, application of decorative elements, and complete suspended ceiling assembly, carried out to achieve smooth, uniform, and high-quality surfaces in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Tameer |
| 46 |
Arqa Palace |
Full upgrade of the Building Management System (BMS) for the first and second phases of Arqa Palace, including assessment of the existing system, supply and installation of new controllers, sensors, and interfaces, system integration, programming, configuration, testing, commissioning, and verification to ensure optimal performance, reliability, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 47 |
Arqa Palace |
Implementation of civil waterproofing works, including thorough surface preparation, application of waterproof membranes or liquid coatings, sealing of joints and penetrations, installation of protective layers, and final inspection to ensure long-lasting water resistance, executed in strict compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 48 |
Al Safa Palace |
Execution of air conditioning system replacement and upgrade, including removal of existing units, supply and installation of new HVAC equipment, ductwork, diffusers, controls, and accessories, integration with the building management system (BMS), testing, balancing, and commissioning to ensure optimal performance, energy efficiency, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 49 |
Al Safa Palace |
Upgrading air conditioning units on guest floors, including removal of existing equipment, supply and installation of new HVAC units, necessary ductwork modifications, integration with the building management system (BMS), functional testing, airflow balancing, and final commissioning to ensure enhanced comfort, energy efficiency, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 50 |
Al Safa Palace |
Execution of air conditioning system improvement works on the royal floors, including replacement of air handling unit (AHU) connections, duct modifications, installation of new piping and controls as required, integration with the building management system (BMS), functional testing, airflow balancing, and final commissioning to ensure optimal performance, comfort, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 51 |
Al Safa Palace |
EReplacement of electrical plugs and data outlets, including removal of existing units, supply and installation of new outlets, proper wiring, testing, and verification to ensure full functionality, safety, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 52 |
Al Safa Palace |
Disassembly, assembly, and design of air coolers, including careful dismantling of existing units, inspection and redesign of components as required, reassembly, testing, and commissioning to ensure optimal performance, efficiency, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 53 |
Al Safa Palace |
Development of a water technology system, including system design, selection of equipment and materials, installation, integration with existing infrastructure, testing, commissioning, and performance verification to ensure efficiency, reliability, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 54 |
Al Mena Palace |
Supply and installation of a water cooling system for the restrooms of Mina Palace, including delivery of all equipment and materials, installation of chillers, piping, pumps, and accessories, connection to existing plumbing and HVAC systems, testing, commissioning, and verification to ensure optimal performance, reliability, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 55 |
Al Mena Palace |
Replacement of electrical plugs and data outlets, including removal of existing units, supply and installation of new outlets, proper wiring and connections, functional testing, and verification to ensure full operation, safety, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 56 |
Al Mena Palace |
Execution of civil and mechanical works, including site preparation, excavation, foundations, structural construction, masonry, flooring, wall and ceiling finishes, partitions, doors and windows, plastering, painting, and all associated architectural and structural works, alongside supply, installation, testing, and commissioning of mechanical systems such as HVAC, plumbing, fire protection, and other building services, carried out in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 57 |
Jazeera Palace |
Implementation of the water cooling system for bath water at Al Jazeera Palace, including supply and installation of chillers, pumps, piping, and accessories, integration with the existing plumbing and HVAC systems, functional testing, commissioning, and verification to ensure optimal cooling performance, reliability, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 58 |
Salam Palace |
Supply and installation of a water cooling system, including delivery of all equipment and materials, installation of chillers, pumps, piping, valves, and accessories, connection to the existing plumbing and HVAC systems, testing, commissioning, and verification to ensure optimal performance, reliability, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 59 |
Chalet Palace |
Replacement and upgrade of the air conditioning system for the gazebo building, including removal of existing units, supply and installation of new HVAC equipment, connection to ductwork and controls, functional testing, balancing, and commissioning to ensure optimal performance, energy efficiency, and compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 60 |
Chalet Palace |
Updating of electrical panels, including excavation and extension works, covering removal or modification of existing panels, supply and installation of new panels or components, routing and extension of cabling as required, connection, testing, and commissioning to ensure safe, reliable operation and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Private Affairs |
| 61 |
Arqa Palace |
Execution of mechanical and programming works, including the supply, installation, and configuration of mechanical equipment, integration with control and automation systems, programming of controllers and devices, functional testing, calibration, and commissioning to ensure optimal performance, reliability, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Bin Laden group |
| 62 |
Makkah Al-Mukarramah region |
EExecution of a sports walkway construction in the Makkah region, including site preparation, excavation, foundation works, paving, installation of walking surfaces, curbs, drainage systems, and finishing works, ensuring durability, safety, accessibility, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Engineering management |
| 63 |
Ras Tanura Municipality |
Completion of the Rahima walkway in Ras Tanura Governorate, including finalization of site preparation, paving, curbs, walking surfaces, drainage systems, landscaping, and finishing works, ensuring durability, safety, accessibility, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ras Tanura Municipality |
| 64 |
Al-Raed High Schools |
Establishment of Al-Raed Educational Complex, including site preparation, civil works, structural construction, architectural finishes, installation of mechanical, electrical, and plumbing (MEP) systems, landscaping, and all associated infrastructure, carried out to ensure functionality, safety, durability, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ministry of Education |
| 65 |
Al-Shifa Private Schools |
Construction and establishment of Al-Shifa Educational Complex, including site preparation, civil and structural works, architectural finishes, installation of mechanical, electrical, and plumbing (MEP) systems, landscaping, and all supporting infrastructure, executed to ensure safety, durability, functionality, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ministry of Education |
| 66 |
Jazan |
Construction of a detention building at the shelter center, including site preparation, excavation, foundation works, structural construction, masonry, roofing, flooring, wall finishes, doors and windows, plastering and painting, installation of mechanical, electrical, and plumbing (MEP) systems, and all associated infrastructure, carried out to ensure security, durability, functionality, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ministry of Finance |
| 67 |
Dawadmi Governorate |
Establishment of a branch building for the Oversight and Investigation Authority, including site preparation, civil and structural works, architectural finishes, installation of mechanical, electrical, and plumbing (MEP) systems, security and communication systems, landscaping, and all supporting infrastructure, executed to ensure functionality, safety, durability, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
Ministry of Finance |
| 68 |
Batha border |
Supply and installation of lighting works, including delivery of all fixtures and materials, installation of indoor and outdoor lighting, wiring, connection to power sources, control systems integration, functional testing, and final commissioning to ensure proper illumination, energy efficiency, safety, and full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
General Authority for Engines
|
| 69 |
South of King Salman Road |
Excavation and removal of the mountain on the land adjacent to the boys' intermediate and secondary school project, including site surveying, blasting or cutting as required, hauling and disposal of excavated material, grading, and leveling of the site, carried out to prepare the land for construction in full compliance with approved drawings, technical specifications, project standards, quality requirements, and safety regulations. |
TBC development |